Key takeaways

  • Permits required for plumbing, electrical, structural.
  • Cosmetic = no permit typically.
  • Pulling permits late costs 2–4x.
  • Closed permits required for resale.
  • Use a permit expediter at scale.

Core concepts

Required scope

Structural, plumbing, electrical, HVAC.

Cosmetic exempt

Paint, floors, cabinets.

Resale check

Buyer inspector verifies closed permits.

Step-by-step framework

  1. 1Identify required permits at scope.
  2. 2File at start.
  3. 3Schedule inspections.
  4. 4Close permits before list.

Common mistakes to avoid

  • No permit on electrical.
  • Filing late.
  • Selling with open permits.

Frequently asked questions

Permit cost?

$200–2000 per scope.

Time to issue?

1–6 weeks.

Resale impact?

Major — open permits kill deals.

Expediter cost?

$300–800.

Action checklist

  • Permits identified.
  • Filed early.
  • Inspections scheduled.
  • Closed before list.