Key takeaways
- Permits required for plumbing, electrical, structural.
- Cosmetic = no permit typically.
- Pulling permits late costs 2–4x.
- Closed permits required for resale.
- Use a permit expediter at scale.
Core concepts
Required scope
Structural, plumbing, electrical, HVAC.
Cosmetic exempt
Paint, floors, cabinets.
Resale check
Buyer inspector verifies closed permits.
Step-by-step framework
- 1Identify required permits at scope.
- 2File at start.
- 3Schedule inspections.
- 4Close permits before list.
Advertisement
Common mistakes to avoid
- No permit on electrical.
- Filing late.
- Selling with open permits.
Frequently asked questions
Permit cost?
$200–2000 per scope.
Time to issue?
1–6 weeks.
Resale impact?
Major — open permits kill deals.
Expediter cost?
$300–800.
Action checklist
- ☐Permits identified.
- ☐Filed early.
- ☐Inspections scheduled.
- ☐Closed before list.
More from House Flipping
House Flipping Best Practices
Discipline, not creativity, drives flip profit — accurate ARV, locked scope, fast execution.
Common Flipping Mistakes
Overpaying, overbuilding, and overstaying — the three errors that turn a profitable flip into a loss.
Beginner's Guide to Flipping
Your first flip — small scope, conservative budget, proven team.
Advanced Flipping Strategy
Parallel deals, capital recycling, and tax planning for high-volume flippers.
Flipping Resource Center
Calculators, market intelligence, and tools for flip underwriting and execution.
70% Rule for Flipping
Why the 70% rule originated in flipping and how to bend it safely in hot markets.